A solving procedure for a general integrated lot-sizing and scheduling problem, International Workshop on Lot Sizing, 2010. ,
Integration of lotsizing and scheduling decisions in a job-shop, European Journal of Operational Research, vol.75, issue.2, pp.413-426, 1994. ,
DOI : 10.1016/0377-2217(94)90085-X
Rolling horizon based planning and scheduling integration with production capacity consideration, Chemical Engineering Science, vol.65, issue.22, pp.5887-5900, 2010. ,
DOI : 10.1016/j.ces.2010.08.010
The impact of sequencing decisions on multi-item lot sizing and scheduling in flow shops, International Journal of Production Research, vol.37, issue.10, pp.2253-2270, 1990. ,
DOI : 10.1080/002075499190752
Multi-level single machine lot-sizing and scheduling with zero lead times, European Journal of Operational Research, vol.209, issue.3, pp.241-252, 2011. ,
DOI : 10.1016/j.ejor.2010.09.022
Economic Lot Sizing: an O(nlogn) algorithm that runs in linear time in the Wagner-Within case, Operations Research, vol.40, issue.1, 1992. ,
A NEW APPROACH FOR SOLVING INTEGRATED PLANNING AND SCHEDULING PROBLEM, INCOM'06 (12th IFAC Symposium on Information control Problems in Manufacturing), pp.191-196, 2006. ,
DOI : 10.3182/20060517-3-FR-2903.00112