The MPS parameterization under lead time uncertainty

Abstract : The supply planning of assembly systems under lead times uncertainty is studied. The used criteria is the sum of the average holding cost for the components, the average backlogging cost for the finished product, and the setup cost. The decision variables are the planned lead times of components and the periodic ordering quantity. A new generalized Newsboy model gives the optimal solution under the assumption that the lead times of the different types of components follow the same distribution probability, and that the holding costs per period of the ordered quantities are the same.
Type de document :
Article dans une revue
International Journal of Production Economics, Elsevier, 2004, 90 (3), pp.Pages 369-376. 〈10.1016/j.ijpe.2003.08.008〉
Liste complète des métadonnées

https://hal-emse.ccsd.cnrs.fr/emse-00704686
Contributeur : Florent Breuil <>
Soumis le : mercredi 6 juin 2012 - 08:25:39
Dernière modification le : jeudi 9 novembre 2017 - 01:01:55

Identifiants

Citation

Mohamed Aly Ould Louly, Alexandre Dolgui. The MPS parameterization under lead time uncertainty. International Journal of Production Economics, Elsevier, 2004, 90 (3), pp.Pages 369-376. 〈10.1016/j.ijpe.2003.08.008〉. 〈emse-00704686〉

Partager

Métriques

Consultations de la notice

101