Configuration d'un système d'assemblage multi-niveau sous incertitudes des délais d'approvisionnement, Proceedings of MOSIM'12 -9th International Conference on Modeling, Optimization & SIMulation, p.10, 2012. ,
Parameterization of MRP for Supply Planning Under Lead Time Uncertainties, pp.247-262, 2008. ,
DOI : 10.5772/5346
A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times, Expert Systems with Applications, 2011. ,
DOI : 10.1016/j.eswa.2011.04.065
Genetic algorithm for supply planning in two-level assembly systems with random lead times, Engineering Applications of Artificial Intelligence, vol.22, issue.6, pp.906-915, 2009. ,
DOI : 10.1016/j.engappai.2008.10.012
URL : https://hal.archives-ouvertes.fr/emse-00710397