O. Alp, N. K. Erkip, and R. Güllü, Optimal lotsizing/vehicle-dispatching policies under stochastic lead times and stepwise fixed costs, Operations Research, vol.51, issue.1, pp.160-166, 2003.

K. Altendorfer and S. Minner, Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates, European Journal of Operational Research, vol.213, pp.134-146, 2011.

R. Anupindi, T. E. Morton, and D. Pentico, The non-stationary stochastic lead-time inventory problem: Near-myopic bounds, heuristics, and testing, Management Science, vol.42, issue.1, pp.124-129, 1996.

Y. Arda and J. C. Hennet, Inventory control in a multisupplier system, International Journal of Production Economics, vol.104, issue.2, pp.249-259, 2006.

J. Arts and G. P. Kiesmüller, Analysis of a twoechelon inventory system with two supply modes, European Journal of Operational Research, vol.225, pp.263-272, 2013.

S. Axsäter, Planning order releases for an assembly system with random operation times, OR Spectrum, vol.27, pp.459-470, 2005.

S. Axsäter, , 2006.

O. Ben-ammar, H. Marian, and A. Dolgui, Configuration d'un système d'assemblage multiniveau sous incertitudes des délais d'approvisionnement, Actes de la conférence internationale Modélisation, Optimisation et Simulation (MOSIM'12), vol.10, 2012.

B. Ammar, O. Marian, H. Wu, D. , and D. A. , A General Mathematical Model for Supply Planning of Multi-level Assembly Systems with Stochastic Lead Times, Proceedings of the IFAC MIM'2013, 2013.

J. H. Bookbinder and C. M. , Random lead times and expected orders in (Q,r) inventory systems, European Journal of Operational Research, vol.115, pp.300-313, 1999.

J. A. Buzacott and J. G. Shanthikumar, Safety stock versus safety time in MRP controlled production systems, Management Science, vol.40, issue.12, pp.1678-1689, 1994.

S. Chauhan, A. Dolgui, and J. Proth, A continuous model for supply planning of assembly systems with stochastic component procurement times, International Journal of Production Economics, vol.120, pp.411-417, 2009.
URL : https://hal.archives-ouvertes.fr/emse-00676007

C. Chiang and W. C. Benton, Sole sourcing versus dual sourcing under stochastic demands and lead times, Naval Research Logistics, vol.41, issue.5, pp.609-624, 1994.

C. Chu, J. M. Proth, and X. Xie, Supply management in assembly systems, Naval Research Logistics, vol.40, pp.933-949, 1993.
URL : https://hal.archives-ouvertes.fr/inria-00074937

A. Dolgui, M. C. Portmann, and J. M. Proth, Planification de systèmes d'assemblage avec approvisionnement aléatoire en composants, Journal of Decision Systems, vol.4, issue.4, pp.255-279, 1995.

A. Dolgui, M. C. Portmann, and J. M. Proth, A control model of the assembly manufacturing, System Modeling and Optimiza-tion. Proceedings of the 17th IFIP TC7 Conference, pp.519-526, 1996.

A. Dolgui, On a model of joint control of reserves in automatic control systems of production. Automation and Remote Control, vol.62, pp.2020-2026, 2001.
URL : https://hal.archives-ouvertes.fr/emse-00704697

A. Dolgui, O. Louly, and M. A. , A Model for Supply Planning under Lead Time Uncertainty, International Journal of Production Economics, vol.78, pp.145-152, 2002.
DOI : 10.1016/s0925-5273(00)00180-8

URL : https://hal.archives-ouvertes.fr/emse-00704687

A. Dolgui, M. A. Ould-louly, and C. Prodhon, A Survey on Supply Planning under Uncertainties in MRP Environments, Proceedings of the 16th IFAC World Congress, 2005.
DOI : 10.3182/20050703-6-cz-1902.01426

URL : https://hal.archives-ouvertes.fr/hal-00387784

A. Dolgui and M. Ould-louly, A model for supply planning under lead time uncertainty, International Journal of Production Economics, vol.78, pp.145-152, 2002.
DOI : 10.1016/s0925-5273(00)00180-8

URL : https://hal.archives-ouvertes.fr/emse-00704687

A. Dolgui and C. Prodhon, Supply planning under uncertainties in MRP environments: A state of the art, Annual Reviews in Control, vol.31, pp.269-279, 2007.
URL : https://hal.archives-ouvertes.fr/emse-00675845

M. Elhafsi, Optimal leadtimes planning in serial production systems with earliness and tardiness costs, IIE Transactions, vol.34, pp.233-243, 2002.

S. T. Enns, MRP performance effects due to forecast bias and demand uncertainty, European Journal of Operational Research, vol.138, issue.1, pp.87-102, 2002.
DOI : 10.1016/s0377-2217(01)00134-5

S. Fallah-jamshidi, N. Karimi, and M. Zandieh, A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times, Expert Systems with Applications, vol.38, issue.11, pp.13549-13554, 2011.

D. Feng, M. Jiang, and L. Chen, Lead-time planning in stochastic production system: An approach using perturbation analysis, Proceedings of the IEEE International Conference on Mechatronics and Automation, ICMA, pp.1134-1138, 2005.

Q. Feng, Integrating dynamic pricing and replenishment decisions under supply capacity uncertainty, Management Science, vol.56, issue.12, pp.2154-2172, 2010.
DOI : 10.1287/mnsc.1100.1238

T. D. Fry, M. D. Oliff, E. D. Minor, and G. K. Leong, The effect of product structure and sequencing rule on assembly shop performance, International Journal of Production Research, vol.27, pp.671-686, 1989.

O. Fujiwara and D. Sedarage, An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead times, European Journal of Operational Research, vol.100, pp.550-556, 1997.
DOI : 10.1016/s0377-2217(96)00230-5

V. Giard and M. Sali, Pilotage d'une chaîne logistique par une approche de type MRP dans un environnement partiellement aléatoire, Journal Européen des Systèmes Automatisés, 2012.
DOI : 10.3166/jesa.46.73-102

URL : https://basepub.dauphine.fr//bitstream/123456789/9021/1/cahier_317.pdf

S. C. Graves, A. North-holland, V. D. Guide, and R. Srivastava, A review of techniques for buffering against uncertainty with MRP systems, Logistics of Production and Inventory, vol.4, pp.223-233, 1993.

R. Guillaume, C. Thierry, and B. Grabot, MRP with imprecise demand and uncertain lead time, Advances in Intelligent Systems Research, vol.1, issue.1, pp.673-679, 2011.
DOI : 10.2991/eusflat.2011.131

URL : https://download.atlantis-press.com/article/2316.pdf

H. Gurnani, R. Akella, and J. Lehoczky, Optimal order policies in assembly systems with random demand and random supplier delivery, IIE Transactions, vol.28, pp.865-878, 1996.
DOI : 10.1080/15458830.1996.11770740

X. He, S. H. Xu, J. K. Ord, and J. C. Hayya, An inventory model with order crossover, Operations Research, vol.46, pp.112-119, 1998.
DOI : 10.1287/opre.46.3.s112

M. Hegedus and W. Hopp, Setting procurement safety lead-times for assembly systems, International Journal of Production Research, vol.39, issue.15, pp.3459-3478, 2001.
DOI : 10.1080/00207540110061625

F. Hnaien, X. Delorme, and A. Dolgui, Genetic algorithm for supply planning in two-level assembly systems with random lead times, Engineering Applications of Artificial Intelligence, vol.22, pp.906-915, 2009.
DOI : 10.1016/j.engappai.2008.10.012

URL : https://hal.archives-ouvertes.fr/emse-00710397

F. Hnaien, X. Delorme, and A. Dolgui, Multiobjective optimization for inventory control in twolevel assembly systems under uncertainty of lead times, Computers & Operations Research, vol.37, pp.1835-1843, 2010.
URL : https://hal.archives-ouvertes.fr/emse-00710388

K. Inderfurth, How to protect against demand and yield risks in MRP systems, International Journal of Production Economics, vol.121, issue.2, pp.474-481, 2009.

K. Inderfurth and S. Vogelgesang, Concepts for safety stock determination under stochastic demand and different types of random production yield, European Journal of Operational Research, vol.224, pp.293-301, 2013.

H. Ishii, T. Nose, S. Shiode, and T. Nishida, Perishable inventory management subject to stochastic leadtime, European Journal of Operational Research, vol.8, issue.1, pp.76-85, 1981.

R. S. Kaplan, A Dynamic Inventory Model with Stochastic Lead Times, Management Science, vol.16, pp.491-507, 1970.

P. Kelle and E. A. Silver, Safety stock reduction by order splitting, Naval Research Logistics, vol.37, pp.725-743, 1990.

J. G. Kim, D. Sun, X. J. He, and J. C. Hayya, The (s,Q) inventory model with Erlang lead time and deterministic demand, Naval Research Logistics, vol.51, pp.906-923, 2004.

S. Koh and S. Saad, MRP-controlled manufacturing environment disturbed by uncertainty, Robotics and Computer-Integrated Manufacturing, vol.12, issue.1-2, pp.157-171, 2003.

A. Kumar, Component Inventory Cost in an Assembly Problem with Uncertain Supplier LeadTimes, IIE Transactions, vol.21, issue.2, pp.112-121, 1989.

H. Lau and L. Zhao, Optimal ordering policies with two suppliers when lead times and demands are all stochastic, European Journal of Operational Research, vol.68, issue.1, pp.120-133, 1993.

M. J. Liberatore, The EOQ Model under Stochastic Lead Times, Operations Research, vol.27, pp.391-396, 1979.

E. Mohebbi and F. Choobineh, The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty, Omega -The International Journal of Management Science, vol.33, pp.472-482, 2005.

E. Mohebbi, F. Choobineh, and A. Pattanayak, Capacity-driven versus demand-driven material procurement systems, International Journal of Production Economics, vol.107, pp.451-466, 2007.

A. Molinder, Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system, International Journal of Production Research, vol.35, pp.983-994, 1997.

J. Mula, R. Poler, J. Garcia-sabater, and F. Lario, Models for production planning under uncertainty: A review, International Journal of Production Economics, vol.103, issue.1, pp.271-285, 2006.

F. Nasri, J. F. Affisco, and M. J. Paknejad, Setup cost reduction in an inventory model with finite-range stochastic lead times, International Journal of Production Research, vol.28, issue.1, pp.199-212, 1990.

M. A. Ould-louly and A. Dolgui, Generalized newsboy model to compute the optimal planned lead times in assembly systems, International Journal of Production Research, vol.40, pp.4401-4414, 2002.
URL : https://hal.archives-ouvertes.fr/emse-00704620

M. Ould-louly and A. Dolgui, Supply planning optimization under uncertainties, International Journal of Agile Manufacturing, vol.5, issue.1, pp.17-26, 2002.

M. A. Ould-louly and A. Dolgui, The MPS parameterization under lead time uncertainty, International Journal of Production Economics, vol.90, pp.369-376, 2004.
URL : https://hal.archives-ouvertes.fr/emse-00704686

M. Ould-louly, A. Dolgui, and F. Hnaien, Supply planning for single-level assembly system with stochastic component delivery times and service level constraint, International Journal of Production Economics, vol.115, issue.1, pp.236-247, 2008.
URL : https://hal.archives-ouvertes.fr/hal-00387670

M. Ould-louly, A. Dolgui, and F. Hnaien, Optimal supply planning in MRP environments for assembly systems with random component procurement times, International Journal of Production Research, vol.46, issue.19, pp.5441-5467, 2008.
URL : https://hal.archives-ouvertes.fr/hal-00387671

M. Ould-louly and A. Dolgui, Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm, European Journal of Operational Research, vol.199, issue.3, pp.723-731, 2009.
URL : https://hal.archives-ouvertes.fr/emse-00676016

M. A. Ould-louly and A. Dolgui, Optimal time phasing and periodicity for MRP with POQ policy, International Journal of Production Economics, vol.131, issue.1, pp.76-86, 2011.

M. A. Ould-louly and A. Dolgui, Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint, International Journal of Production Economics, vol.143, pp.35-40, 2013.

J. M. Proth, G. Mauroy, Y. Wardi, C. Chu, and X. Xie, Supply management for cost minimization in assembly systems with random components yield times, Journal of Intelligent Manufacturing, vol.8, pp.385-403, 1997.

R. V. Ramasesh, J. Keith-ord, J. C. Hayya, and A. Pan, Sole versus dual sourcing in stochastic leadtime (s,Q) inventory models, Management Science, vol.37, issue.4, pp.428-443, 1991.

D. B. Roman and A. G. Valle, Dynamic assignment of due dates in an assembly shop based in simulation, International Journal of Production Research, vol.34, pp.1539-1554, 1996.

R. Sakiani, S. F. Ghomi, and M. Zandieh, Multiobjective supply planning for two-level assembly systems with stochastic lead times, Computers &, 2012.

, Operations Research, vol.39, issue.7, pp.1325-1332

D. Sculli and S. Y. Wu, Stock control with two suppliers and normal lead time, Journal of Operational Research Society, vol.32, issue.11, pp.1003-1009, 1981.

E. A. Silver, Inventory control of raw materials under stochastic and seasonal lead times, International Journal of Production Research, vol.40, issue.17, pp.4401-4414, 2005.

C. H. Smith, E. D. Minor, and H. J. Wen, Regression-based due date assignment rules for improved assembly shop performance, International Journal of Production Research, vol.33, pp.2375-2385, 1995.

J. Song, S. H. Xu, and B. Liu, Order-fulfillment performance measures in an assemble-to-order system with stochastic leadtimes, Operations Research, vol.47, issue.1, pp.131-149, 1999.

D. P. Song, C. Hicks, and C. F. Earl, Due date planning in manufacturing systems with complex product structure and uncertain processing times, International Journal of Production Economics, vol.76, issue.3, pp.243-256, 2002.

D. P. Song, C. Hicks, and C. F. Earl, Stage due date planning for multistage assembly systems, International Journal of Production Research, vol.39, issue.9, pp.1943-1954, 2001.

J. S. Song, The effect of leadtime uncertainty in a simple stochastic inventory model, Management Science, vol.40, issue.5, pp.603-613, 1994.

J. S. Song, C. A. Yano, and P. Lerssrisuriya, Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty. Manufacturing and Service Operations Management, vol.2, pp.287-296, 2000.

J. S. Song, H. Zhang, Y. Hou, W. , and M. , The effect of lead time and demand uncertainties in (r, q) inventory systems, Operations Research, vol.58, issue.1, pp.68-80, 2010.

G. P. Sphicas and F. Nasri, Inventory model with finite-range stochastic lead times, Naval Research Logistics, vol.31, issue.4, pp.609-616, 1984.

A. Svoronos and P. Zipkin, Evaluation of onefor-one replenishment policies for multiechelon inventory systems, Management Science, vol.37, pp.68-83, 1991.

O. Tang and R. W. Grubbström, The detailed coordination problem in a two-level assembly system with stochastic lead times, International Journal Production Economics, pp.415-429, 2003.

O. Tang and R. W. Grubbström, Considering stochastic lead times in a manufacturing/ remanufacturing system with deterministic demands and returns, International Journal of Production Economics, pp.285-300, 2005.

Y. Tang, S. Ma, and Q. Zhou, Optimal planned leadtimes in two-level assembly system with inventory liability period contract, Proceedings of the 2012 International Conference on Management Science and Engineering (ICMSE), pp.439-444, 2012.
DOI : 10.1109/icmse.2012.6414218

N. Vandaele, D. Boeck, and L. , Advanced Resource Planning, Robotics and Computer Integrated Manufacturing, vol.19, pp.211-218, 2003.
DOI : 10.1016/s0736-5845(02)00081-9

URL : http://www.icsd.aegean.gr/aic2003/papers/vandaele.pdf

J. Van-kampen-tim, P. Van-donk-dirk, and D. Van-der-zee, Safety stock or safety lead time: coping with unreliability in demand and supply, International Journal of Production Research, vol.48, pp.7463-7481, 2010.

T. E. Vollman, W. L. Berry, and C. D. Whybark, Manufacturing Planning and Control Systems, 1997.

B. Vollman and J. Whybark, Manufacturing Planning and Control for Supply Chain Management, 2005.

M. Wazed, A. Shamsuddin, Y. , and N. , Uncertainty factors in real manufacturing environment, Australian Journal of Basic and Applied Sciences, vol.3, issue.2, pp.342-351, 2009.

J. K. Weeks, Optimizing Planned Lead Times and Delivery Dates, Proceedings of the 21st annual Conference of American Production and Inventory Control Society, pp.177-188, 1981.

D. C. Whybark and J. G. Williams, Material Requirements Planning Under Uncertainty, Decision Science, vol.7, pp.595-606, 1976.
DOI : 10.1111/j.1540-5915.1976.tb00704.x

C. A. Yano, Setting planned leadtimes in serial production systems with tardiness costs, Management Science, vol.33, issue.1, pp.95-106, 1987.
DOI : 10.1287/mnsc.33.1.95

C. A. Yano, Planned leadtimes for serial production systems, IIE Transactions, vol.19, issue.3, pp.300-307, 1987.
DOI : 10.1080/07408178708975400

C. A. Yano, Stochastic leadtimes in two-level assembly systems, IIE Transactions, vol.19, issue.4, pp.95-106, 1987.
DOI : 10.1080/07408178708975409

D. Zalkind, Order-level inventory systems with independent stochastic leadtimes, Management Science, vol.24, issue.13, pp.1384-1392, 1978.
DOI : 10.1287/mnsc.24.13.1384

Y. Zhao and D. Simchi-levi, Performance analysis and evaluation of assemble-to-order systems with stochastic sequential lead times, Operation Research, vol.54, issue.4, pp.706-724, 2006.

P. Zipkin, Foundation of Inventory Management, 2000.

P. Zipkin, Stochastic Leadtimes in ContinuousTime Inventory Models. Naval Research Logistics, vol.33, pp.763-774, 1986.
DOI : 10.1002/nav.3800330419