Smoothing Procedures for an Integrated Approach for Multi-Level Lot Sizing and Detailed Scheduling - Mines Saint-Étienne
Conference Papers Year : 2013

Smoothing Procedures for an Integrated Approach for Multi-Level Lot Sizing and Detailed Scheduling

Abstract

The integration of production planning and scheduling decisions represents an important challenge in production management. Typical Enterprise Resource Planning (ERP) systems, using Manufacturing Resource Planning (MRP-II) technique for capacity management, cannot guarantee feasible procurement and production plans at the operational level (short term planning horizon). In this paper we study the integrated multi-level lot-sizing and job-shop scheduling problem. We analyze various smoothing procedures that "repair" the relaxed capacity and Bill-Of-Materials (BOM) constraints in the Lagrangian heuristic of a recent approach.
Fichier principal
Vignette du fichier
IWSL2013_Gomez_et_al_v2.pdf (42.47 Ko) Télécharger le fichier
Origin Files produced by the author(s)
Loading...

Dates and versions

emse-00998470 , version 1 (02-06-2014)

Identifiers

  • HAL Id : emse-00998470 , version 1

Cite

Edwin David Gómez Urrutia, Riad Aggoune, Stéphane Dauzère-Pérès. Smoothing Procedures for an Integrated Approach for Multi-Level Lot Sizing and Detailed Scheduling. 4th International Workshop on Lot Sizing (IWLS 2013), Aug 2013, Brussels, Belgium. ⟨emse-00998470⟩
184 View
232 Download

Share

More