B. Ammar, O. Marian, H. Dolgui, and A. , Optimization for supply planning in multilevel assembly systems with stochastic lead-times, th International Conference on Industrial Engineering and System Management (IESM'13). Morocco, 2013.
URL : https://hal.archives-ouvertes.fr/emse-00903613

B. Ammar, O. Marian, H. Wu, D. Dolgui, and A. , Mathematical Model for Supply Planning of Multi-level Assembly Systems with Stochastic Lead Times Invited keynote paper for a special session, Proceedings of the IFAC Conference on Manufacturing Modelling , Management and Control (MIM'2013), 2013.

B. Ammar, O. Marian, H. Dolgui, and A. , Configuration d'un système d'assemblage multi-niveau sous incertitudes des délais d'approvisionnement. 9 th International Conference on Modeling, Optimization and SIMulation (MOSIM'12), 2012.

A. Dolgui and C. Prodhon, Supply planning under uncertainties in MRP environments: A state of the art, Annual Reviews in Control, vol.31, issue.2, pp.269-279, 2007.
DOI : 10.1016/j.arcontrol.2007.02.007

URL : https://hal.archives-ouvertes.fr/emse-00675845

. A. Dolgui, O. F. Hnaien, and M. M. Louly, Parameterization of MRP for Supply Planning Under Lead Time Uncertainties, pp.247-262, 2008.
DOI : 10.5772/5346

S. S. Koh, Managing uncertainty in ERP-controlled manufacturing environments in SMEs, International Journal of Production Economics, vol.101, issue.1, pp.109-127, 2006.
DOI : 10.1016/j.ijpe.2005.05.011

F. Hnaien, A. Dolgui, O. Louly, and M. , Planned lead time optimization in material requirement planning environment for multilevel production systems, Journal of Systems Science and Systems Engineering, vol.19, issue.4, pp.132-155, 2008.
DOI : 10.1007/s11518-008-5072-z

F. Hnaien, X. Delorme, and A. Dolgui, Genetic algorithm for supply planning in two-level assembly systems with random lead times, Engineering Applications of Artificial Intelligence, vol.22, issue.6, pp.906-915, 2009.
DOI : 10.1016/j.engappai.2008.10.012

URL : https://hal.archives-ouvertes.fr/emse-00710397

S. Fallah-jamshidi, N. Karimi, and M. Zandieh, A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times, Expert Systems with Applications, 2011.
DOI : 10.1016/j.eswa.2011.04.065

. A. Molinder, Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system, International Journal of Production Research, vol.35, issue.4, pp.983-994, 1997.
DOI : 10.1080/002075497195498

O. Louly, M. Dolgui, and A. , Generalized newsboy model to compute the optimal planned lead times in assembly systems, International Journal of Production Research, vol.21, issue.17, pp.4401-4414, 2002.
DOI : 10.1080/002075499190383

URL : https://hal.archives-ouvertes.fr/emse-00704620

O. Louly, M. Dolgui, A. And-hnaien, and F. , Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint, International Journal of Production Economics, vol.115, issue.1, pp.236-247, 2008.
DOI : 10.1016/j.ijpe.2008.06.005

URL : https://hal.archives-ouvertes.fr/hal-00387670

O. Louly, M. Dolgui, A. And-hnaien, and F. , Optimal supply planning in MRP environments for assembly systems with random component procurement times, International Journal of Production Research, vol.19, issue.19, pp.5441-5467, 2008.
DOI : 10.1002/nav.3800330419

URL : https://hal.archives-ouvertes.fr/hal-00387671