Optimization for supply planning in multilevel assembly systems with stochastic lead-times, th International Conference on Industrial Engineering and System Management (IESM'13). Morocco, 2013. ,
URL : https://hal.archives-ouvertes.fr/emse-00903613
Mathematical Model for Supply Planning of Multi-level Assembly Systems with Stochastic Lead Times Invited keynote paper for a special session, Proceedings of the IFAC Conference on Manufacturing Modelling , Management and Control (MIM'2013), 2013. ,
Configuration d'un système d'assemblage multi-niveau sous incertitudes des délais d'approvisionnement. 9 th International Conference on Modeling, Optimization and SIMulation (MOSIM'12), 2012. ,
Supply planning under uncertainties in MRP environments: A state of the art, Annual Reviews in Control, vol.31, issue.2, pp.269-279, 2007. ,
DOI : 10.1016/j.arcontrol.2007.02.007
URL : https://hal.archives-ouvertes.fr/emse-00675845
Parameterization of MRP for Supply Planning Under Lead Time Uncertainties, pp.247-262, 2008. ,
DOI : 10.5772/5346
Managing uncertainty in ERP-controlled manufacturing environments in SMEs, International Journal of Production Economics, vol.101, issue.1, pp.109-127, 2006. ,
DOI : 10.1016/j.ijpe.2005.05.011
Planned lead time optimization in material requirement planning environment for multilevel production systems, Journal of Systems Science and Systems Engineering, vol.19, issue.4, pp.132-155, 2008. ,
DOI : 10.1007/s11518-008-5072-z
Genetic algorithm for supply planning in two-level assembly systems with random lead times, Engineering Applications of Artificial Intelligence, vol.22, issue.6, pp.906-915, 2009. ,
DOI : 10.1016/j.engappai.2008.10.012
URL : https://hal.archives-ouvertes.fr/emse-00710397
A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times, Expert Systems with Applications, 2011. ,
DOI : 10.1016/j.eswa.2011.04.065
Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system, International Journal of Production Research, vol.35, issue.4, pp.983-994, 1997. ,
DOI : 10.1080/002075497195498
Generalized newsboy model to compute the optimal planned lead times in assembly systems, International Journal of Production Research, vol.21, issue.17, pp.4401-4414, 2002. ,
DOI : 10.1080/002075499190383
URL : https://hal.archives-ouvertes.fr/emse-00704620
Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint, International Journal of Production Economics, vol.115, issue.1, pp.236-247, 2008. ,
DOI : 10.1016/j.ijpe.2008.06.005
URL : https://hal.archives-ouvertes.fr/hal-00387670
Optimal supply planning in MRP environments for assembly systems with random component procurement times, International Journal of Production Research, vol.19, issue.19, pp.5441-5467, 2008. ,
DOI : 10.1002/nav.3800330419
URL : https://hal.archives-ouvertes.fr/hal-00387671