K. Agpak and H. Gokcen, A chance-constrained approach to stochastic line balancing problem, European Journal of Operational Research, vol.180, issue.3, pp.1098-1115, 2007.
DOI : 10.1016/j.ejor.2006.04.042

S. Agrawal and M. K. Tiwari, A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem, International Journal of Production Research, vol.46, issue.6, pp.1405-1429, 2008.
DOI : 10.1007/s00170-003-1590-5

F. T. Altekin and C. Akkan, Task-failure-driven rebalancing of disassembly lines, International Journal of Production Research, vol.34, issue.10, pp.4955-4976, 2011.
DOI : 10.1109/70.744614

S. Avikal, P. K. Mishra, and R. Jain, A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems, International Journal of Production Research, vol.3, issue.1, pp.1306-1317, 2014.
DOI : 10.1016/S0278???6125(97)88465???8

A. Aydemir-karadag and O. Turkbey, Multi-objective optimization of stochastic disassembly line balancing with station paralleling, Computers & Industrial Engineering, vol.65, issue.3, pp.413-425, 2013.
DOI : 10.1016/j.cie.2013.03.014

O. Battaïa and A. Dolgui, A taxonomy of line balancing problems and their solutionapproaches, International Journal of Production Economics, vol.142, issue.2, pp.259-277, 2013.
DOI : 10.1016/j.ijpe.2012.10.020

A. Baykaso?lu and L. Özbak?r, Stochastic U-line balancing using genetic algorithms, The International Journal of Advanced Manufacturing Technology, vol.4, issue.4, pp.139-147, 2007.
DOI : 10.1007/s00170-005-0322-4

, Figure 3. The selected (optimal) disassembly alternative and the corresponding task assignment to the determined workstations of the instance TZC02

M. L. Bentaha, O. Battaïa, and A. Dolgui, A Stochastic Formulation of the Disassembly Line Balancing Problem, Advances in Production Management Systems Competitive Manufacturing for Innovative Products and Services, pp.397-404, 2013.
DOI : 10.1287/mnsc.32.4.455

URL : https://hal.archives-ouvertes.fr/hal-01963453

M. L. Bentaha, O. Battaia, and A. Dolgui, Chance Constrained Programming Model for Stochastic Profit???Oriented Disassembly Line Balancing in the Presence of Hazardous Parts, Advances in Production Management Systems Sustainable Production and Service Supply Chains, pp.103-110, 2013.
DOI : 10.1007/978-3-642-41266-0_13

URL : https://hal.archives-ouvertes.fr/hal-01963445

M. L. Bentaha, O. Battaïa, and A. Dolgui, A sample average approximation method for disassembly line balancing problem under uncertainty, Computers & Operations Research, vol.51, pp.111-122, 2014.
DOI : 10.1016/j.cor.2014.05.006

URL : https://hal.archives-ouvertes.fr/hal-01963423

M. L. Bentaha, O. Battaïa, and A. Dolgui, Disassembly Line Balancing and Sequencing under Uncertainty, Procedia CIRP, vol.15, pp.239-244, 2014.
DOI : 10.1016/j.procir.2014.06.016

URL : https://hal.archives-ouvertes.fr/emse-01011304

M. L. Bentaha, O. Battaïa, and A. Dolgui, Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem, Procedia CIRP, vol.17, pp.56-60, 2014.
DOI : 10.1016/j.procir.2014.02.049

URL : https://hal.archives-ouvertes.fr/emse-01052948

M. L. Bentaha, O. Battaïa, A. Dolgui, and S. J. Hu, Dealing with uncertainty in disassembly line design, CIRP Annals, vol.63, issue.1, pp.21-24, 2014.
DOI : 10.1016/j.cirp.2014.03.004

URL : https://hal.archives-ouvertes.fr/emse-00978385

J. Cheng and A. Lisser, A second-order cone programming approach for linear programs with joint probabilistic constraints, Operations Research Letters, vol.40, issue.5, pp.325-328, 2012.
DOI : 10.1016/j.orl.2012.06.008

W. Chiang and T. L. Urban, The stochastic U-line balancing problem: A heuristic procedure, European Journal of Operational Research, vol.175, issue.3, pp.1767-1781, 2006.
DOI : 10.1016/j.ejor.2004.10.031

E. Erel, I. Sabuncuoglu, and H. Sekerci, Stochastic assembly line balancing using beam search, International Journal of Production Research, vol.6, issue.7, pp.1411-1426, 2005.
DOI : 10.1287/mnsc.44.5.738

J. Galambos, Bonferroni Inequalities, The Annals of Probability, vol.5, issue.4, pp.577-581, 1997.
DOI : 10.1214/aop/1176995765

A. Güngör and S. M. Gupta, Disassembly Line Balancing, Proceedings of the Annual Meeting of the Northeast Decision Sciences Institute, pp.193-195, 1999.

A. Güngör and S. M. Gupta, A solution approach to the disassembly line balancing problem in the presence of task failures, International Journal of Production Research, vol.39, issue.7, pp.1427-1467, 2001.
DOI : 10.1080/00207540110052157

A. Güngör and S. M. Gupta, Disassembly line in product recovery, International Journal of Production Research, vol.5, issue.11, pp.2569-2589, 2002.
DOI : 10.1023/A:1018500603358

M. A. Ilgin and S. M. Gupta, Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art, Journal of Environmental Management, vol.91, issue.3, pp.563-591, 2010.
DOI : 10.1016/j.jenvman.2009.09.037

A. Koc, I. Sabuncuoglu, and E. Erel, Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph, IIE Transactions, vol.41, issue.10, pp.866-881, 2009.
DOI : 10.1016/j.ejor.2004.07.022

J. D. Lamberta, Linear programming in disassembly/clustering sequence generation, Computers & Industrial Engineering, vol.36, issue.4, pp.723-738, 1999.
DOI : 10.1016/S0360-8352(99)00162-X

Y. Ma, H. Jun, H. Kim, and D. Lee, Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal, International Journal of Production Research, vol.34, issue.23, pp.7007-7027, 2011.
DOI : 10.1109/70.843173

S. Mcgovern and S. A. Gupta, A balancing method and genetic algorithm for disassembly line balancing, European Journal of Operational Research, vol.179, issue.3, pp.692-708, 2007.
DOI : 10.1016/j.ejor.2005.03.055

A. Meacham, R. Uzsoy, and U. Venkatadri, Optimal disassembly configurations for single and multiple products, Journal of Manufacturing Systems, vol.18, issue.5, pp.311-322, 1999.
DOI : 10.1016/S0278-6125(00)87634-7

E. Özceylan, T. Paksoy, and T. Bekta?, Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing, Transportation Research Part E: Logistics and Transportation Review, vol.61, pp.142-164, 2014.
DOI : 10.1016/j.tre.2013.11.001

T. Paksoy, A. Güngör, E. Özceylan, and A. Hancilar, Mixed model disassembly line balancing problem with fuzzy goals, International Journal of Production Research, vol.1, issue.1, pp.6082-6096, 2013.
DOI : 10.1016/0165-0114(78)90031-3

Y. Tang, M. Zhou, E. Zussman, and R. Caudill, Disassembly modeling, planning, and application, Journal of Manufacturing Systems, vol.21, issue.3, pp.200-217, 2002.
DOI : 10.1016/S0278-6125(02)80162-5

M. Tripathi, S. Agrawal, M. K. Pandey, R. Shankar, and M. K. Tiwari, Real world disassembly modeling and sequencing problem: Optimization by Algorithm of Self-Guided Ants (ASGA), Robotics and Computer-Integrated Manufacturing, vol.25, issue.3, pp.483-496, 2009.
DOI : 10.1016/j.rcim.2008.02.004

E. Tuncel, A. Zeid, and S. Kamarthi, Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning, Journal of Intelligent Manufacturing, vol.8, issue.3, pp.1-13, 2012.
DOI : 10.1023/A:1018500603358

T. L. Urban and W. Chiang, An optimal piecewise-linear program for the U-line balancing problem with stochastic task times, European Journal of Operational Research, vol.168, issue.3, pp.771-782, 2006.
DOI : 10.1016/j.ejor.2004.07.027

M. H. Wang and M. R. Johnson, Disassembly Sequence Generation Using a Neural Network Approach, Journal of Manufacturing Systems, vol.19, issue.2, pp.73-82, 2000.