S. Agrawal and M. K. Tiwari, A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem, International Journal of Production Research, vol.46, issue.6, pp.1405-1429, 2006.
DOI : 10.1007/s00170-003-1590-5

F. Alizadeh and D. Goldfarb, Second-order cone programming, Mathematical Programming, vol.95, issue.1, pp.3-51, 2003.
DOI : 10.1007/s10107-002-0339-5

F. T. Altekin and C. Akkan, Task-failure-driven rebalancing of disassembly lines, International Journal of Production Research, vol.34, issue.10, pp.4955-4976, 2012.
DOI : 10.1109/70.744614

F. T. Altekin, L. Kandiller, and N. E. Ozdemirel, Profit-oriented disassembly-line balancing, International Journal of Production Research, vol.5, issue.10, pp.2675-2693, 2008.
DOI : 10.1287/mnsc.11.7.727

K. A?-gpak and H. Gökçen, A chance-constrained approach to stochastic line balancing problem, European Journal of Operational Research, vol.180, issue.3, pp.1098-1115, 2007.
DOI : 10.1016/j.ejor.2006.04.042

A. Aydemir-karadag and O. Turkbey, Multi-objective optimization of stochastic disassembly line balancing with station paralleling, Computers & Industrial Engineering, vol.65, issue.3, pp.413-425, 2013.
DOI : 10.1016/j.cie.2013.03.014

M. Bagher, M. Zandieh, and H. Farsijani, Balancing of stochastic U-type assembly lines: an imperialist competitive algorithm, The International Journal of Advanced Manufacturing Technology, vol.14, issue.4, pp.1-4, 2011.
DOI : 10.1016/j.simpat.2005.05.001

I. Baybars, A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem, Management Science, vol.32, issue.8, pp.909-932, 1986.
DOI : 10.1287/mnsc.32.8.909

A. Baykaso?-glu and L. Özbak?r, Stochastic U-line balancing using genetic algorithms, The International Journal of Advanced Manufacturing Technology, vol.4, issue.4, pp.139-147, 2007.
DOI : 10.1007/s00170-005-0322-4

C. Becker and A. Scholl, A survey on problems and methods in generalized assembly line balancing, European Journal of Operational Research, vol.168, issue.3, pp.694-715, 2006.
DOI : 10.1016/j.ejor.2004.07.023

M. L. Bentaha, O. Battaïa, and A. Dolgui, Chance Constrained Programming Model for Stochastic Profit???Oriented Disassembly Line Balancing in the Presence of Hazardous Parts, IFIP advances in information and communication technology, pp.103-110, 2013.
DOI : 10.1007/978-3-642-41266-0_13

URL : https://hal.archives-ouvertes.fr/hal-01963445

M. L. Bentaha, O. Battaïa, and A. Dolgui, A decomposition method for stochastic partial disassembly line balancing with profit maximization, 2013 IEEE International Conference on Automation Science and Engineering (CASE), pp.410-415, 2013.
DOI : 10.1109/CoASE.2013.6654016

URL : https://hal.archives-ouvertes.fr/hal-01963449

M. L. Bentaha, O. Battaïa, and A. Dolgui, A Stochastic Formulation of the Disassembly Line Balancing Problem, IFIP advances in information and communication technology, pp.397-404, 2013.
DOI : 10.1287/mnsc.32.4.455

URL : https://hal.archives-ouvertes.fr/hal-01963453

M. L. Bentaha, O. Battaïa, and A. Dolgui, A sample average approximation method for disassembly line balancing problem under uncertainty, Computers & Operations Research, vol.51, pp.111-122, 2014.
DOI : 10.1016/j.cor.2014.05.006

URL : https://hal.archives-ouvertes.fr/emse-01083333

M. L. Bentaha, O. Battaïa, and A. Dolgui, Disassembly Line Balancing and Sequencing under Uncertainty, Procedia CIRP, vol.15, pp.239-244, 2014.
DOI : 10.1016/j.procir.2014.06.016

URL : https://hal.archives-ouvertes.fr/emse-01011304

M. L. Bentaha, O. Battaïa, and A. Dolgui, Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem, Procedia CIRP, vol.17, pp.56-60, 2014.
DOI : 10.1016/j.procir.2014.02.049

URL : https://hal.archives-ouvertes.fr/emse-01052948

M. L. Bentaha, O. Battaïa, A. Dolgui, and S. J. Hu, Dealing with uncertainty in disassembly line design, CIRP Annals, vol.63, issue.1, pp.21-24, 2014.
DOI : 10.1016/j.cirp.2014.03.004

URL : https://hal.archives-ouvertes.fr/hal-01963440

J. Betts and K. I. Mahmoud, Identifying multiple solutions for assembly line balancing having stochastic task times, Computers & Industrial Engineering, vol.16, issue.3, pp.427-445, 1989.
DOI : 10.1016/0360-8352(89)90161-7

L. Blackmore, M. Ono, and B. Williams, Chance-Constrained Optimal Path Planning With Obstacles, IEEE Transactions on Robotics, vol.27, issue.6, pp.1080-1094, 2011.
DOI : 10.1109/TRO.2011.2161160

S. Boyd and L. Vandenberghe, Convex Optimization, 2004.

M. Branda, Chance constrained problems: Penalty reformulation and performance of sample approximation technique, Kybernetika, vol.48, issue.1, pp.105-122, 2012.

B. Cakir, F. Altiparmak, and B. Dengiz, Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm, Computers & Industrial Engineering, vol.60, issue.3, pp.376-384, 2011.
DOI : 10.1016/j.cie.2010.08.013

L. Capacho and R. Pastor, The ASALB Problem with Processing Alternatives Involving Different Tasks: Definition, Formalization and Resolution, Computational science and its applications -ICCSA 2006, pp.554-563, 2006.
DOI : 10.1007/11751595_59

L. Capacho and R. Pastor, ASALBP: the alternative subgraphs assembly line balancing problem, International Journal of Production Research, vol.32, issue.13, pp.3503-3516, 2008.
DOI : 10.1016/0167-6377(82)90046-3

URL : https://hal.archives-ouvertes.fr/hal-00512975

L. Capacho, R. Pastor, A. Dolgui, and O. Guschinskaya, An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem, Journal of Heuristics, vol.44, issue.2, pp.109-132, 2007.
DOI : 10.1287/mnsc.32.4.430

URL : https://hal.archives-ouvertes.fr/emse-00673020

J. C. Carter and F. N. Silverman, A cost-effective approach to stochastic line balancing with off-line repairs, Journal of Operations Management, vol.4, issue.2, pp.145-157, 1984.
DOI : 10.1016/0272-6963(84)90029-9

A. K. Chakravarty and A. Shtub, A cost minimization procedure for mixed model production lines with normally distributed task times, European Journal of Operational Research, vol.23, issue.1, pp.25-36, 1986.
DOI : 10.1016/0377-2217(86)90211-0

J. Cheng and A. Lisser, A second-order cone programming approach for linear programs with joint probabilistic constraints, Operations Research Letters, vol.40, issue.5, pp.325-328, 2012.
DOI : 10.1016/j.orl.2012.06.008

W. Chiang and T. L. Urban, The stochastic U-line balancing problem: A heuristic procedure, European Journal of Operational Research, vol.175, issue.3, pp.1767-1781, 2006.
DOI : 10.1016/j.ejor.2004.10.031

M. Chica, . Óscar-cordón, S. Damas, and J. Bautista, A robustness information and visualization model for time and space assembly line balancing under uncertain demand, International Journal of Production Economics, vol.145, issue.2, pp.761-772, 2013.
DOI : 10.1016/j.ijpe.2013.05.030

C. A. Depaolo and D. J. Rader-jr, A heuristic algorithm for a chance constrained stochastic program, European Journal of Operational Research, vol.176, issue.1, pp.27-45, 2007.
DOI : 10.1016/j.ejor.2005.08.008

E. Erel, I. Sabuncuoglu, and H. Sekerci, Stochastic assembly line balancing using beam search, International Journal of Production Research, vol.6, issue.7, pp.1411-1426, 2005.
DOI : 10.1287/mnsc.44.5.738

H. Fazlollahtabar, H. Hajmohammadi, and A. Es-'haghzadeh, A heuristic methodology for assembly line balancing considering stochastic time and validity testing, The International Journal of Advanced Manufacturing Technology, vol.168, issue.6, pp.1-4, 2011.
DOI : 10.1080/00207548908942537

J. Galambos, Bonferroni inequalities. The Annals of Probability, pp.577-581, 1977.
DOI : 10.1214/aop/1176995765

URL : http://doi.org/10.1214/aop/1176995765

R. Gamberini, E. Gebennini, A. Grassi, and A. Regattieri, A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem, International Journal of Production Research, vol.4, issue.6, pp.47-2141, 2009.
DOI : 10.1023/A:1010997816249

URL : https://hal.archives-ouvertes.fr/hal-00513040

R. Gamberini, A. Grassi, and B. Rimini, A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem, International Journal of Production Economics, vol.102, issue.2, pp.226-243, 2006.
DOI : 10.1016/j.ijpe.2005.02.013

F. Guerriero and J. Miltenburg, The stochastic U-line balancing problem, Naval Research Logistics, vol.44, issue.1, pp.31-57, 2003.
DOI : 10.1287/mnsc.44.5.738

A. Güngör and S. M. Gupta, A solution approach to the disassembly line balancing problem in the presence of task failures, International Journal of Production Research, vol.39, issue.7, pp.1427-1467, 2001.
DOI : 10.1080/00207540110052157

A. Güngör and S. M. Gupta, Disassembly line in product recovery, International Journal of Production Research, vol.5, issue.11, pp.2569-2589, 2002.
DOI : 10.1023/A:1018500603358

E. Gurevsky, O. Battaïa, and A. Dolgui, Stability measure for a generalized assembly line balancing problem, Discrete Applied Mathematics, vol.161, issue.3, pp.377-394, 2013.
DOI : 10.1016/j.dam.2012.08.037

URL : https://hal.archives-ouvertes.fr/hal-01721626

E. Gurevsky, Ö. Haz?r, O. Battaïa, and A. Dolgui, Robust balancing of straight assembly lines with interval task times, Journal of the Operational Research Society, vol.64, issue.11, pp.1607-1613, 2013.
DOI : 10.1016/j.ejor.2004.07.027

Ö. Haz?r and A. Dolgui, Assembly line balancing under uncertainty: Robust optimization models and exact solution method, Computers & Industrial Engineering, vol.65, issue.2, pp.261-267, 2013.
DOI : 10.1016/j.cie.2013.03.004

Ö. Haz?r and A. Dolgui, A decomposition based solution algorithm for U-type assembly line balancing with interval data, Computers & Operations Research, vol.59, pp.126-131, 2015.
DOI : 10.1016/j.cor.2015.01.010

M. I. Henig, Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems, Computers & Operations Research, vol.13, issue.4, pp.443-449, 1986.
DOI : 10.1016/0305-0548(86)90032-8

M. A. Ilgin and S. M. Gupta, Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art, Journal of Environmental Management, vol.91, issue.3, pp.91-563, 2010.
DOI : 10.1016/j.jenvman.2009.09.037

M. Ilgin and S. Gupta, Remanufacturing modeling and analysis, 2012.
DOI : 10.1201/b11778

R. Jagannathan, Chance-Constrained Programming with Joint Constraints, Operations Research, vol.22, issue.2, pp.358-372, 1974.
DOI : 10.1287/opre.22.2.358

E. P. Kao, Computational experience with a stochastic assembly line balancing algorithm, Computers & Operations Research, vol.6, issue.2, pp.79-86, 1979.
DOI : 10.1016/0305-0548(79)90019-4

E. P. Kao, A Preference Order Dynamic Program for Stochastic Assembly Line Balancing, Management Science, vol.22, issue.10, pp.1097-1104, 1976.
DOI : 10.1287/mnsc.22.10.1097

A. Koc, I. Sabuncuoglu, and E. Erel, Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph, IIE Transactions, vol.41, issue.10, pp.41-866, 2009.
DOI : 10.1016/j.ejor.2004.07.022

A. J. Lambert, Linear programming in disassembly/clustering sequence generation, Computers & Industrial Engineering, vol.36, issue.4, pp.723-738, 1999.
DOI : 10.1016/S0360-8352(99)00162-X

A. J. Lambert, Determining optimum disassembly sequences in electronic equipment, Computers & Industrial Engineering, vol.43, issue.3, pp.553-575, 2002.
DOI : 10.1016/S0360-8352(02)00125-0

F. Liu, Z. Wen, and Y. Xu, A dual-uncertainty-based chance-constrained model for municipal solid waste management, Applied Mathematical Modelling, vol.37, issue.22, pp.37-9147, 2013.
DOI : 10.1016/j.apm.2013.04.036

S. Liu, H. Ong, and H. Huang, A bidirectional heuristic for stochastic assembly line balancing Type II problem, The International Journal of Advanced Manufacturing Technology, vol.27, issue.1-2, pp.71-77, 2005.
DOI : 10.1007/s00170-002-1504-y

M. S. Lobo, L. Vandenberghe, S. Boyd, and H. Lebret, Applications of second-order cone programming, Linear Algebra and its Applications, vol.284, issue.1-3, pp.193-228, 1998.
DOI : 10.1016/S0024-3795(98)10032-0

URL : https://doi.org/10.1016/s0024-3795(98)10032-0

J. Lyu, A single?run optimization algorithm for stochastic assembly line balancing problems, Journal of Manufacturing Systems, vol.16, issue.3, pp.204-210, 1997.

Y. Ma, H. Jun, H. Kim, and D. Lee, Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal, International Journal of Production Research, vol.34, issue.23, pp.49-7007, 2011.
DOI : 10.1109/70.843173

A. Magnani and S. Boyd, Convex piecewise-linear fitting, Optimization and Engineering, vol.19, issue.1, pp.1-17, 2009.
DOI : 10.1007/3-540-57568-5_283

P. R. Mcmullen and G. V. Frazier, A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations, International Journal of Production Economics, vol.51, issue.3, pp.177-190, 1997.
DOI : 10.1016/S0925-5273(97)00048-0

G. Mesfin and M. Shuhaimi, A chance constrained approach for a gas processing plant with uncertain feed conditions, Computers & Chemical Engineering, vol.34, issue.8, pp.1256-1267, 2010.
DOI : 10.1016/j.compchemeng.2010.03.009

A. Nemirovski, On safe tractable approximations of chance constraints, European Journal of Operational Research, vol.219, issue.3, pp.707-718, 2012.
DOI : 10.1016/j.ejor.2011.11.006

A. Nemirovski and A. Shapiro, Convex Approximations of Chance Constrained Programs, SIAM Journal on Optimization, vol.17, issue.4, pp.969-996, 2007.
DOI : 10.1137/050622328

URL : http://ie.technion.ac.il/Labs/Opt/opt/Pap/63.pdf

U. Özcan, Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm, European Journal of Operational Research, vol.205, issue.1, pp.81-97, 2010.
DOI : 10.1016/j.ejor.2009.11.033

U. Özcan, T. Kellegöz, and B. Toklu, A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem, International Journal of Production Research, vol.16, issue.6, pp.1605-1626, 2011.
DOI : 10.1016/S0305-0548(96)00033-0

C. A. Poojari and B. Varghese, Genetic Algorithm based technique for solving Chance Constrained Problems, European Journal of Operational Research, vol.185, issue.3, pp.1128-1154, 2008.
DOI : 10.1016/j.ejor.2006.06.045

URL : http://edoc.hu-berlin.de/series/speps/2006-3/PDF/3.pdf

A. Prékopa, K. Yoda, and M. M. Subasi, Uniform quasi-concavity in probabilistic constrained stochastic programming, Operations Research Letters, vol.39, issue.3, pp.188-192, 2011.
DOI : 10.1016/j.orl.2011.03.007

A. Raouf and C. L. Tsui, A new method for assembly line balancing having stochastic work elements, Computers & Industrial Engineering, vol.6, issue.2, pp.131-148, 1982.
DOI : 10.1016/0360-8352(82)90017-1

D. Reich, A linear programming approach for linear programs with probabilistic constraints, European Journal of Operational Research, vol.230, issue.3, pp.487-494, 2013.
DOI : 10.1016/j.ejor.2013.04.049

S. C. Sarin, E. Erel, and E. M. Dar-el, A methodology for solving single-model, stochastic assembly line balancing problem, Omega, vol.27, issue.5, pp.525-535, 1999.
DOI : 10.1016/S0305-0483(99)00016-X

URL : http://repository.bilkent.edu.tr/bitstream/11693/13587/1/10.1016-S0305-0483%2899%2900016-X.pdf

A. Scholl, N. Boysen, and M. Fliedner, Optimally solving the alternative subgraphs assembly line balancing problem, Annals of Operations Research, vol.9, issue.1, pp.143-258, 2009.
DOI : 10.1080/05695557108974787

URL : https://www.db-thueringen.de/servlets/MCRFileNodeServlet/dbt_derivate_00020981/2008-5.pdf

S. Shen, J. Smith, and S. Ahmed, Expectation and Chance-Constrained Models and Algorithms for Insuring Critical Paths, Management Science, vol.56, issue.10, pp.1794-1814, 2010.
DOI : 10.1287/mnsc.1100.1208

D. Shin, An efficient heuristic for solving stochastic assembly line balancing problems, Computers & Industrial Engineering, vol.18, issue.3, pp.285-295, 1990.
DOI : 10.1016/0360-8352(90)90050-V

F. N. Silverman and J. C. Carter, A Cost-Based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages, Management Science, vol.32, issue.4, pp.455-463, 1986.
DOI : 10.1287/mnsc.32.4.455

Y. N. Sotskov, A. Dolgui, and M. Portmann, Stability analysis of an optimal balance for an assembly line with fixed cycle time, European Journal of Operational Research, vol.168, issue.3, pp.783-797, 2006.
DOI : 10.1016/j.ejor.2004.07.028

URL : https://hal.archives-ouvertes.fr/hal-00387647

M. Turowski and M. Morgan, Disassembly Line Design with Uncertainty, 2005 IEEE International Conference on Systems, Man and Cybernetics, pp.954-959, 2005.
DOI : 10.1109/ICSMC.2005.1571269

T. L. Urban and W. Chiang, An optimal piecewise-linear program for the U-line balancing problem with stochastic task times, European Journal of Operational Research, vol.168, issue.3, pp.771-782, 2006.
DOI : 10.1016/j.ejor.2004.07.027

Q. Wang, Y. Guan, and J. Wang, A Chance-Constrained Two-Stage Stochastic Program for Unit Commitment With Uncertain Wind Power Output, IEEE Transactions on Power Systems, vol.27, issue.1, pp.206-215, 2012.
DOI : 10.1109/TPWRS.2011.2159522

T. Watanabe and H. Ellis, A joint chance-constrained programming model with row dependence, European Journal of Operational Research, vol.77, issue.2, pp.325-343, 1994.
DOI : 10.1016/0377-2217(94)90376-X

H. Zhang and P. Li, Chance Constrained Programming for Optimal Power Flow Under Uncertainty, IEEE Transactions on Power Systems, vol.26, issue.4, pp.2417-2424, 2011.
DOI : 10.1109/TPWRS.2011.2154367

X. Zhao, J. Liu, K. Ohno, and S. Kotani, Modeling and analysis of a mixed-model assembly line with stochastic operation times, Naval Research Logistics, vol.51, issue.6, pp.681-691, 2007.
DOI : 10.1007/978-3-662-11223-6

URL : http://onlinelibrary.wiley.com/doi/10.1002/nav.20241/pdf

R. Zorgati and W. Van-ackooij, Optimizing financial and physical assets with??chance-constrained programming in??the??electrical??industry, Optimization and Engineering, vol.24, issue.2, pp.237-255, 2011.
DOI : 10.1109/TPWRS.2009.2016586

URL : http://www.engopt.org/nukleo/pdfs/0255_engopt_rio_2008_paper_zorgati_van_ackooij.pdf