A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem, International Journal of Production Research, vol.46, issue.6, pp.1405-1429, 2006. ,
DOI : 10.1007/s00170-003-1590-5
Second-order cone programming, Mathematical Programming, vol.95, issue.1, pp.3-51, 2003. ,
DOI : 10.1007/s10107-002-0339-5
Task-failure-driven rebalancing of disassembly lines, International Journal of Production Research, vol.34, issue.10, pp.4955-4976, 2012. ,
DOI : 10.1109/70.744614
Profit-oriented disassembly-line balancing, International Journal of Production Research, vol.5, issue.10, pp.2675-2693, 2008. ,
DOI : 10.1287/mnsc.11.7.727
A chance-constrained approach to stochastic line balancing problem, European Journal of Operational Research, vol.180, issue.3, pp.1098-1115, 2007. ,
DOI : 10.1016/j.ejor.2006.04.042
Multi-objective optimization of stochastic disassembly line balancing with station paralleling, Computers & Industrial Engineering, vol.65, issue.3, pp.413-425, 2013. ,
DOI : 10.1016/j.cie.2013.03.014
Balancing of stochastic U-type assembly lines: an imperialist competitive algorithm, The International Journal of Advanced Manufacturing Technology, vol.14, issue.4, pp.1-4, 2011. ,
DOI : 10.1016/j.simpat.2005.05.001
A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem, Management Science, vol.32, issue.8, pp.909-932, 1986. ,
DOI : 10.1287/mnsc.32.8.909
Stochastic U-line balancing using genetic algorithms, The International Journal of Advanced Manufacturing Technology, vol.4, issue.4, pp.139-147, 2007. ,
DOI : 10.1007/s00170-005-0322-4
A survey on problems and methods in generalized assembly line balancing, European Journal of Operational Research, vol.168, issue.3, pp.694-715, 2006. ,
DOI : 10.1016/j.ejor.2004.07.023
Chance Constrained Programming Model for Stochastic Profit???Oriented Disassembly Line Balancing in the Presence of Hazardous Parts, IFIP advances in information and communication technology, pp.103-110, 2013. ,
DOI : 10.1007/978-3-642-41266-0_13
URL : https://hal.archives-ouvertes.fr/hal-01963445
A decomposition method for stochastic partial disassembly line balancing with profit maximization, 2013 IEEE International Conference on Automation Science and Engineering (CASE), pp.410-415, 2013. ,
DOI : 10.1109/CoASE.2013.6654016
URL : https://hal.archives-ouvertes.fr/hal-01963449
A Stochastic Formulation of the Disassembly Line Balancing Problem, IFIP advances in information and communication technology, pp.397-404, 2013. ,
DOI : 10.1287/mnsc.32.4.455
URL : https://hal.archives-ouvertes.fr/hal-01963453
A sample average approximation method for disassembly line balancing problem under uncertainty, Computers & Operations Research, vol.51, pp.111-122, 2014. ,
DOI : 10.1016/j.cor.2014.05.006
URL : https://hal.archives-ouvertes.fr/emse-01083333
Disassembly Line Balancing and Sequencing under Uncertainty, Procedia CIRP, vol.15, pp.239-244, 2014. ,
DOI : 10.1016/j.procir.2014.06.016
URL : https://hal.archives-ouvertes.fr/emse-01011304
Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem, Procedia CIRP, vol.17, pp.56-60, 2014. ,
DOI : 10.1016/j.procir.2014.02.049
URL : https://hal.archives-ouvertes.fr/emse-01052948
Dealing with uncertainty in disassembly line design, CIRP Annals, vol.63, issue.1, pp.21-24, 2014. ,
DOI : 10.1016/j.cirp.2014.03.004
URL : https://hal.archives-ouvertes.fr/hal-01963440
Identifying multiple solutions for assembly line balancing having stochastic task times, Computers & Industrial Engineering, vol.16, issue.3, pp.427-445, 1989. ,
DOI : 10.1016/0360-8352(89)90161-7
Chance-Constrained Optimal Path Planning With Obstacles, IEEE Transactions on Robotics, vol.27, issue.6, pp.1080-1094, 2011. ,
DOI : 10.1109/TRO.2011.2161160
Convex Optimization, 2004. ,
Chance constrained problems: Penalty reformulation and performance of sample approximation technique, Kybernetika, vol.48, issue.1, pp.105-122, 2012. ,
Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm, Computers & Industrial Engineering, vol.60, issue.3, pp.376-384, 2011. ,
DOI : 10.1016/j.cie.2010.08.013
The ASALB Problem with Processing Alternatives Involving Different Tasks: Definition, Formalization and Resolution, Computational science and its applications -ICCSA 2006, pp.554-563, 2006. ,
DOI : 10.1007/11751595_59
ASALBP: the alternative subgraphs assembly line balancing problem, International Journal of Production Research, vol.32, issue.13, pp.3503-3516, 2008. ,
DOI : 10.1016/0167-6377(82)90046-3
URL : https://hal.archives-ouvertes.fr/hal-00512975
An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem, Journal of Heuristics, vol.44, issue.2, pp.109-132, 2007. ,
DOI : 10.1287/mnsc.32.4.430
URL : https://hal.archives-ouvertes.fr/emse-00673020
A cost-effective approach to stochastic line balancing with off-line repairs, Journal of Operations Management, vol.4, issue.2, pp.145-157, 1984. ,
DOI : 10.1016/0272-6963(84)90029-9
A cost minimization procedure for mixed model production lines with normally distributed task times, European Journal of Operational Research, vol.23, issue.1, pp.25-36, 1986. ,
DOI : 10.1016/0377-2217(86)90211-0
A second-order cone programming approach for linear programs with joint probabilistic constraints, Operations Research Letters, vol.40, issue.5, pp.325-328, 2012. ,
DOI : 10.1016/j.orl.2012.06.008
The stochastic U-line balancing problem: A heuristic procedure, European Journal of Operational Research, vol.175, issue.3, pp.1767-1781, 2006. ,
DOI : 10.1016/j.ejor.2004.10.031
A robustness information and visualization model for time and space assembly line balancing under uncertain demand, International Journal of Production Economics, vol.145, issue.2, pp.761-772, 2013. ,
DOI : 10.1016/j.ijpe.2013.05.030
A heuristic algorithm for a chance constrained stochastic program, European Journal of Operational Research, vol.176, issue.1, pp.27-45, 2007. ,
DOI : 10.1016/j.ejor.2005.08.008
Stochastic assembly line balancing using beam search, International Journal of Production Research, vol.6, issue.7, pp.1411-1426, 2005. ,
DOI : 10.1287/mnsc.44.5.738
A heuristic methodology for assembly line balancing considering stochastic time and validity testing, The International Journal of Advanced Manufacturing Technology, vol.168, issue.6, pp.1-4, 2011. ,
DOI : 10.1080/00207548908942537
Bonferroni inequalities. The Annals of Probability, pp.577-581, 1977. ,
DOI : 10.1214/aop/1176995765
URL : http://doi.org/10.1214/aop/1176995765
A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem, International Journal of Production Research, vol.4, issue.6, pp.47-2141, 2009. ,
DOI : 10.1023/A:1010997816249
URL : https://hal.archives-ouvertes.fr/hal-00513040
A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem, International Journal of Production Economics, vol.102, issue.2, pp.226-243, 2006. ,
DOI : 10.1016/j.ijpe.2005.02.013
The stochastic U-line balancing problem, Naval Research Logistics, vol.44, issue.1, pp.31-57, 2003. ,
DOI : 10.1287/mnsc.44.5.738
A solution approach to the disassembly line balancing problem in the presence of task failures, International Journal of Production Research, vol.39, issue.7, pp.1427-1467, 2001. ,
DOI : 10.1080/00207540110052157
Disassembly line in product recovery, International Journal of Production Research, vol.5, issue.11, pp.2569-2589, 2002. ,
DOI : 10.1023/A:1018500603358
Stability measure for a generalized assembly line balancing problem, Discrete Applied Mathematics, vol.161, issue.3, pp.377-394, 2013. ,
DOI : 10.1016/j.dam.2012.08.037
URL : https://hal.archives-ouvertes.fr/hal-01721626
Robust balancing of straight assembly lines with interval task times, Journal of the Operational Research Society, vol.64, issue.11, pp.1607-1613, 2013. ,
DOI : 10.1016/j.ejor.2004.07.027
Assembly line balancing under uncertainty: Robust optimization models and exact solution method, Computers & Industrial Engineering, vol.65, issue.2, pp.261-267, 2013. ,
DOI : 10.1016/j.cie.2013.03.004
A decomposition based solution algorithm for U-type assembly line balancing with interval data, Computers & Operations Research, vol.59, pp.126-131, 2015. ,
DOI : 10.1016/j.cor.2015.01.010
Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems, Computers & Operations Research, vol.13, issue.4, pp.443-449, 1986. ,
DOI : 10.1016/0305-0548(86)90032-8
Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art, Journal of Environmental Management, vol.91, issue.3, pp.91-563, 2010. ,
DOI : 10.1016/j.jenvman.2009.09.037
Remanufacturing modeling and analysis, 2012. ,
DOI : 10.1201/b11778
Chance-Constrained Programming with Joint Constraints, Operations Research, vol.22, issue.2, pp.358-372, 1974. ,
DOI : 10.1287/opre.22.2.358
Computational experience with a stochastic assembly line balancing algorithm, Computers & Operations Research, vol.6, issue.2, pp.79-86, 1979. ,
DOI : 10.1016/0305-0548(79)90019-4
A Preference Order Dynamic Program for Stochastic Assembly Line Balancing, Management Science, vol.22, issue.10, pp.1097-1104, 1976. ,
DOI : 10.1287/mnsc.22.10.1097
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph, IIE Transactions, vol.41, issue.10, pp.41-866, 2009. ,
DOI : 10.1016/j.ejor.2004.07.022
Linear programming in disassembly/clustering sequence generation, Computers & Industrial Engineering, vol.36, issue.4, pp.723-738, 1999. ,
DOI : 10.1016/S0360-8352(99)00162-X
Determining optimum disassembly sequences in electronic equipment, Computers & Industrial Engineering, vol.43, issue.3, pp.553-575, 2002. ,
DOI : 10.1016/S0360-8352(02)00125-0
A dual-uncertainty-based chance-constrained model for municipal solid waste management, Applied Mathematical Modelling, vol.37, issue.22, pp.37-9147, 2013. ,
DOI : 10.1016/j.apm.2013.04.036
A bidirectional heuristic for stochastic assembly line balancing Type II problem, The International Journal of Advanced Manufacturing Technology, vol.27, issue.1-2, pp.71-77, 2005. ,
DOI : 10.1007/s00170-002-1504-y
Applications of second-order cone programming, Linear Algebra and its Applications, vol.284, issue.1-3, pp.193-228, 1998. ,
DOI : 10.1016/S0024-3795(98)10032-0
URL : https://doi.org/10.1016/s0024-3795(98)10032-0
A single?run optimization algorithm for stochastic assembly line balancing problems, Journal of Manufacturing Systems, vol.16, issue.3, pp.204-210, 1997. ,
Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal, International Journal of Production Research, vol.34, issue.23, pp.49-7007, 2011. ,
DOI : 10.1109/70.843173
Convex piecewise-linear fitting, Optimization and Engineering, vol.19, issue.1, pp.1-17, 2009. ,
DOI : 10.1007/3-540-57568-5_283
A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations, International Journal of Production Economics, vol.51, issue.3, pp.177-190, 1997. ,
DOI : 10.1016/S0925-5273(97)00048-0
A chance constrained approach for a gas processing plant with uncertain feed conditions, Computers & Chemical Engineering, vol.34, issue.8, pp.1256-1267, 2010. ,
DOI : 10.1016/j.compchemeng.2010.03.009
On safe tractable approximations of chance constraints, European Journal of Operational Research, vol.219, issue.3, pp.707-718, 2012. ,
DOI : 10.1016/j.ejor.2011.11.006
Convex Approximations of Chance Constrained Programs, SIAM Journal on Optimization, vol.17, issue.4, pp.969-996, 2007. ,
DOI : 10.1137/050622328
URL : http://ie.technion.ac.il/Labs/Opt/opt/Pap/63.pdf
Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm, European Journal of Operational Research, vol.205, issue.1, pp.81-97, 2010. ,
DOI : 10.1016/j.ejor.2009.11.033
A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem, International Journal of Production Research, vol.16, issue.6, pp.1605-1626, 2011. ,
DOI : 10.1016/S0305-0548(96)00033-0
Genetic Algorithm based technique for solving Chance Constrained Problems, European Journal of Operational Research, vol.185, issue.3, pp.1128-1154, 2008. ,
DOI : 10.1016/j.ejor.2006.06.045
URL : http://edoc.hu-berlin.de/series/speps/2006-3/PDF/3.pdf
Uniform quasi-concavity in probabilistic constrained stochastic programming, Operations Research Letters, vol.39, issue.3, pp.188-192, 2011. ,
DOI : 10.1016/j.orl.2011.03.007
A new method for assembly line balancing having stochastic work elements, Computers & Industrial Engineering, vol.6, issue.2, pp.131-148, 1982. ,
DOI : 10.1016/0360-8352(82)90017-1
A linear programming approach for linear programs with probabilistic constraints, European Journal of Operational Research, vol.230, issue.3, pp.487-494, 2013. ,
DOI : 10.1016/j.ejor.2013.04.049
A methodology for solving single-model, stochastic assembly line balancing problem, Omega, vol.27, issue.5, pp.525-535, 1999. ,
DOI : 10.1016/S0305-0483(99)00016-X
URL : http://repository.bilkent.edu.tr/bitstream/11693/13587/1/10.1016-S0305-0483%2899%2900016-X.pdf
Optimally solving the alternative subgraphs assembly line balancing problem, Annals of Operations Research, vol.9, issue.1, pp.143-258, 2009. ,
DOI : 10.1080/05695557108974787
URL : https://www.db-thueringen.de/servlets/MCRFileNodeServlet/dbt_derivate_00020981/2008-5.pdf
Expectation and Chance-Constrained Models and Algorithms for Insuring Critical Paths, Management Science, vol.56, issue.10, pp.1794-1814, 2010. ,
DOI : 10.1287/mnsc.1100.1208
An efficient heuristic for solving stochastic assembly line balancing problems, Computers & Industrial Engineering, vol.18, issue.3, pp.285-295, 1990. ,
DOI : 10.1016/0360-8352(90)90050-V
A Cost-Based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages, Management Science, vol.32, issue.4, pp.455-463, 1986. ,
DOI : 10.1287/mnsc.32.4.455
Stability analysis of an optimal balance for an assembly line with fixed cycle time, European Journal of Operational Research, vol.168, issue.3, pp.783-797, 2006. ,
DOI : 10.1016/j.ejor.2004.07.028
URL : https://hal.archives-ouvertes.fr/hal-00387647
Disassembly Line Design with Uncertainty, 2005 IEEE International Conference on Systems, Man and Cybernetics, pp.954-959, 2005. ,
DOI : 10.1109/ICSMC.2005.1571269
An optimal piecewise-linear program for the U-line balancing problem with stochastic task times, European Journal of Operational Research, vol.168, issue.3, pp.771-782, 2006. ,
DOI : 10.1016/j.ejor.2004.07.027
A Chance-Constrained Two-Stage Stochastic Program for Unit Commitment With Uncertain Wind Power Output, IEEE Transactions on Power Systems, vol.27, issue.1, pp.206-215, 2012. ,
DOI : 10.1109/TPWRS.2011.2159522
A joint chance-constrained programming model with row dependence, European Journal of Operational Research, vol.77, issue.2, pp.325-343, 1994. ,
DOI : 10.1016/0377-2217(94)90376-X
Chance Constrained Programming for Optimal Power Flow Under Uncertainty, IEEE Transactions on Power Systems, vol.26, issue.4, pp.2417-2424, 2011. ,
DOI : 10.1109/TPWRS.2011.2154367
Modeling and analysis of a mixed-model assembly line with stochastic operation times, Naval Research Logistics, vol.51, issue.6, pp.681-691, 2007. ,
DOI : 10.1007/978-3-662-11223-6
URL : http://onlinelibrary.wiley.com/doi/10.1002/nav.20241/pdf
Optimizing financial and physical assets with??chance-constrained programming in??the??electrical??industry, Optimization and Engineering, vol.24, issue.2, pp.237-255, 2011. ,
DOI : 10.1109/TPWRS.2009.2016586
URL : http://www.engopt.org/nukleo/pdfs/0255_engopt_rio_2008_paper_zorgati_van_ackooij.pdf