A method for assembly line balancing with more than one worker in each station, International Journal of Production Research, vol.23, issue.5, pp.755-770, 1983. ,
DOI : 10.1299/jsme1958.23.1670
Two extensions for the ALWABP: Parallel stations and collaborative approach, International Journal of Production Economics, vol.140, issue.1, pp.483-495, 2012. ,
DOI : 10.1016/j.ijpe.2012.06.032
A taxonomy of line balancing problems and their solutionapproaches, International Journal of Production Economics, vol.142, issue.2, pp.259-277, 2013. ,
DOI : 10.1016/j.ijpe.2012.10.020
Preemptable malleable task scheduling problem, IEEE Transactions on Computers, vol.55, issue.4, pp.486-490, 2006. ,
DOI : 10.1109/TC.2006.58
, Objective values and relative errors of the obtained solutions
Stations Sequential- Station Sequential- Station-Random Sequential-One- Traveling- Worker Min-Idle-One- Traveling- Worker Random-One- Traveling- Worker Sequential- Additional- Workers Random- Additional, Workers Workers Gap (%) Workers Gap (%) Workers Gap (%) Workers Gap (%) Workers Gap (%) Workers Gap (%) Workers Gap (%) Workers Gap (%) ,
On solving the assembly line worker assignment and balancing problem via beam search, Computers & Operations Research, vol.38, issue.1, pp.328-329, 2011. ,
DOI : 10.1016/j.cor.2010.05.008
Workforce Aging in Production Systems: Modeling and Performance Evaluation, Procedia Engineering, vol.100, pp.1108-1115, 2015. ,
DOI : 10.1016/j.proeng.2015.01.473
A heuristic and a branch-and-bound algorithm for the Assembly Line Worker Assignment and Balancing Problem, Computers & Operations Research, vol.45, pp.87-96, 2014. ,
DOI : 10.1016/j.cor.2013.12.002
Job rotation in assembly lines employing disabled workers, International Journal of Production Economics, vol.120, issue.2, pp.625-632, 2009. ,
DOI : 10.1016/j.ijpe.2009.04.013
Balancing assembly line with skilled and unskilled workers, Omega, vol.36, issue.6, pp.1126-1132, 2008. ,
DOI : 10.1016/j.omega.2006.03.003
Workforce planning incorporating skills: State of the art, European Journal of Operational Research, vol.243, issue.1, pp.1-16, 2015. ,
DOI : 10.1016/j.ejor.2014.10.038
Supply Chain Engineering: Useful Methods and Techniques, 2010. ,
DOI : 10.1007/978-1-84996-017-5
URL : https://hal.archives-ouvertes.fr/emse-00675734
An effective approximation algorithm for the Malleable Parallel Task Scheduling problem, Journal of Parallel and Distributed Computing, vol.72, issue.5, pp.693-704, 2012. ,
DOI : 10.1016/j.jpdc.2012.01.011
Heuristics for workforce planning with worker differences, European Journal of Operational Research, vol.190, issue.3, pp.724-740, 2008. ,
DOI : 10.1016/j.ejor.2007.06.038
Computers and Intractability: A Guide to the NP- Completeness, 1979. ,
The effect of worker learning on manual order picking processes, International Journal of Production Economics, vol.170, 2015. ,
DOI : 10.1016/j.ijpe.2014.12.018
The effect of worker learning and forgetting on storage reassignment decisions in order picking systems, Computers & Industrial Engineering, vol.66, issue.4, pp.653-662, 2013. ,
DOI : 10.1016/j.cie.2013.09.013
Integer programming techniques for solving non-linear workforce planning models with learning, European Journal of Operational Research, vol.242, issue.3, pp.942-950, 2015. ,
DOI : 10.1016/j.ejor.2014.10.060
A non-zero integer non-linear programming model for maintenance workforce sizing, International Journal of Production Economics, vol.150, pp.204-214, 2014. ,
DOI : 10.1016/j.ijpe.2014.01.004
Scheduling malleable tasks with precedence constraints, Journal of Computer and System Sciences, vol.78, issue.1, pp.245-259, 2012. ,
DOI : 10.1016/j.jcss.2011.04.003
An optimization model for worker assignment of a mixed model vehicle production assembly line under worker mobility, Proceedings of the 41st International Conference on Computers & Industrial Engineering, pp.483-490, 2011. ,
Development of operator assignment schedules: A DSS approach, Omega, vol.22, issue.1, pp.57-67, 1994. ,
DOI : 10.1016/0305-0483(94)90007-8
Advantages of assembly lines in Sheltered Work Centres for Disabled. A case study, International Journal of Production Economics, vol.110, issue.1-2, pp.1-2, 2007. ,
DOI : 10.1016/j.ijpe.2007.02.023
Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled, Discrete Applied Mathematics, vol.156, issue.3, pp.357-367, 2008. ,
DOI : 10.1016/j.dam.2005.12.012
URL : https://doi.org/10.1016/j.dam.2005.12.012
Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers, International Journal of Production Economics, vol.141, issue.2, pp.552-560, 2013. ,
DOI : 10.1016/j.ijpe.2012.09.011
Model and heuristics for the Assembly Line Worker Integration and Balancing Problem, Computers & Operations Research, vol.54, pp.64-73, 2015. ,
DOI : 10.1016/j.cor.2014.08.021
An iterative genetic algorithm for the assembly line worker assignment and balancing problem of type-II, Computers & Operations Research, vol.40, issue.1, pp.418-426, 2013. ,
DOI : 10.1016/j.cor.2012.07.010
Optimal allocation of heterogeneous workers in a U-shaped production line, Computers & Industrial Engineering, vol.54, issue.3, pp.432-440, 2008. ,
DOI : 10.1016/j.cie.2007.08.007
An optimal worker allocation problem for a U-shaped production line, International Journal of Production Economics, vol.60, issue.61, pp.60-61, 1999. ,
DOI : 10.1016/S0925-5273(98)00145-5
Worker allocation in make-to-order assembly cells, Robotics and Computer-Integrated Manufacturing, vol.25, issue.6, pp.932-936, 2009. ,
DOI : 10.1016/j.rcim.2009.04.008
Integrating workers??? differences into workforce planning, Computers & Industrial Engineering, vol.63, issue.4, pp.1096-1106, 2012. ,
DOI : 10.1016/j.cie.2012.06.015
Integer programming models for hierarchical workforce scheduling problems including excess off-days and idle labour times, 2013. ,
, Appl. Math. Model, vol.37, issue.22, pp.9117-9131
A dominant class of schedules for malleable jobs in the problem to minimize the total weighted completion time, Computers & Operations Research, vol.39, issue.6, pp.1265-1270, 2012. ,
DOI : 10.1016/j.cor.2011.02.023
Worker allocation in lean U-shaped production lines, International Journal of Production Research, vol.40, issue.13, pp.3485-3502, 2008. ,
DOI : 10.1287/mnsc.44.5.738
Assembly line balancing with hierarchical worker assignment, Journal of Manufacturing Systems, vol.37, 2015. ,
DOI : 10.1016/j.jmsy.2014.08.004
A master scheduling model with skilled and unskilled temporary workers, International Journal of Production Economics, vol.103, issue.2, pp.798-809, 2006. ,
DOI : 10.1016/j.ijpe.2005.11.009
Workforce planning in synchronous production systems, European Journal of Operational Research, vol.136, issue.3, pp.551-572, 2002. ,
DOI : 10.1016/S0377-2217(01)00056-X
Evaluation of performance measures for representing operational objectives of a mixed model assembly line balancing problem, International Journal of Production Research, vol.46, issue.22, pp.6367-6388, 2008. ,
DOI : 10.1016/0967-0661(94)00066-P
Formulation of a problem involving assembly lines with multiple manning of work stations, International Journal of Production Research, vol.24, issue.1, pp.59-63, 1986. ,
DOI : 10.1080/00207548408942450
Reducing worker(s) by converting assembly line into a pure cell system, International Journal of Production Economics, vol.145, issue.2, pp.799-806, 2013. ,
DOI : 10.1016/j.ijpe.2013.06.009