Flow line balancing problem: A survey

Abstract : Flow lines are widely used in mechanical industry. They consist to a set of workstations through which parts are manufactured. Designing such a line is a very complex problem due to manufacturing and design constraints and to the large number of possible decisions. Usually, the design of this type of production lines involves the selection of the necessary operations (indivisible units of work) to machine a part, the configuration design, the line scheduling. In this paper we present a survey of flow lines balancing problem, their approach and formulation and some solutions to optimize them studied in the literature. A special attention is paid for the assembly lines balancing problems.
Type de document :
Communication dans un congrès
International Conference on Industrial Engineering and Systems Management (IESM), 2015, Oct 2015, Seville, Spain. pp. 1065-1071, 2016, Proceedings of 2015 International Conference on Industrial Engineering and Systems Management, IEEE IESM 2015. 〈10.1109/IESM.2015.7380287〉
Liste complète des métadonnées

https://hal-emse.ccsd.cnrs.fr/emse-01437327
Contributeur : Florent Breuil <>
Soumis le : mardi 17 janvier 2017 - 10:53:10
Dernière modification le : vendredi 23 février 2018 - 15:28:57

Identifiants

Citation

Olga Battaïa, Xavier Delorme, Alexandre Dolgui, Frédéric Grimaud, Brigitte Finel. Flow line balancing problem: A survey. International Conference on Industrial Engineering and Systems Management (IESM), 2015, Oct 2015, Seville, Spain. pp. 1065-1071, 2016, Proceedings of 2015 International Conference on Industrial Engineering and Systems Management, IEEE IESM 2015. 〈10.1109/IESM.2015.7380287〉. 〈emse-01437327〉

Partager

Métriques

Consultations de la notice

114