Scheduling job families on non identical parallel machines under Run-To-Run control constraints

Abstract : New challenges are arising when solving scheduling problems in semiconductor manufacturing plants (fabs) with Advanced Process Control (APC) constraints. In particular, a Run-To-Run (R2R) control loop for a given product on a machine requires to regularly collect data for the product on the machine. This paper aims at introducing and modeling a new scheduling problem in which there is a time constraint on jobs of the same product, i.e. the time interval between two consecutive jobs of the same product should be smaller than a given threshold. Two Mixed Integer Linear Programming models are presented for scheduling jobs on non-identical parallel machines with setup times.
Type de document :
Communication dans un congrès
12th International Conference devoted to Project Management and Scheduling, Apr 2010, Tours, France. pp.309, 2010
Liste complète des métadonnées

Littérature citée [5 références]  Voir  Masquer  Télécharger

https://hal-emse.ccsd.cnrs.fr/emse-00643985
Contributeur : Ali Obeid <>
Soumis le : mercredi 23 novembre 2011 - 13:27:48
Dernière modification le : mercredi 29 novembre 2017 - 10:08:08
Document(s) archivé(s) le : vendredi 16 novembre 2012 - 11:52:02

Fichier

PMS2010_Obeid_et_al.pdf
Fichiers produits par l'(les) auteur(s)

Identifiants

  • HAL Id : emse-00643985, version 1

Collections

Citation

Ali Obeid, Stéphane Dauzère-Pérès, Claude Yugma, Ariane Ferreira. Scheduling job families on non identical parallel machines under Run-To-Run control constraints. 12th International Conference devoted to Project Management and Scheduling, Apr 2010, Tours, France. pp.309, 2010. 〈emse-00643985〉

Partager

Métriques

Consultations de la notice

247

Téléchargements de fichiers

277