Scheduling job families on non identical parallel machines under Run-To-Run control constraints - Mines Saint-Étienne
Communication Dans Un Congrès Année : 2010

Scheduling job families on non identical parallel machines under Run-To-Run control constraints

Résumé

New challenges are arising when solving scheduling problems in semiconductor manufacturing plants (fabs) with Advanced Process Control (APC) constraints. In particular, a Run-To-Run (R2R) control loop for a given product on a machine requires to regularly collect data for the product on the machine. This paper aims at introducing and modeling a new scheduling problem in which there is a time constraint on jobs of the same product, i.e. the time interval between two consecutive jobs of the same product should be smaller than a given threshold. Two Mixed Integer Linear Programming models are presented for scheduling jobs on non-identical parallel machines with setup times.
Fichier principal
Vignette du fichier
PMS2010_Obeid_et_al.pdf (87.22 Ko) Télécharger le fichier
Origine Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

emse-00643985 , version 1 (23-11-2011)

Identifiants

  • HAL Id : emse-00643985 , version 1

Citer

Ali Obeid, Stéphane Dauzère-Pérès, Claude Yugma, Ariane Ferreira. Scheduling job families on non identical parallel machines under Run-To-Run control constraints. 12th International Conference devoted to Project Management and Scheduling, Apr 2010, Tours, France. pp.309. ⟨emse-00643985⟩
191 Consultations
399 Téléchargements

Partager

More