Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint - Mines Saint-Étienne
Article Dans Une Revue Journal of Intelligent Manufacturing Année : 2012

Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint

Résumé

This study deals with component supply planning in assembly systems, i.e. where several types of components are needed to produce one finished product. The actual component lead times have random deviations, so they can be considered as random variables. MRP approach with Periodic Order Quantity policy is considered. The aim is to find the optimal MRP offsetting. The proposed model and algorithms minimize the sum of the setup and average holding costs for the components, while satisfying a desired service level.

Dates et versions

emse-00673896 , version 1 (24-02-2012)

Identifiants

Citer

Mohamed-Aly Louly, Alexandre Dolgui, Abdulrahman Al-Ahmari. Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint. Journal of Intelligent Manufacturing, 2012, Volume 23 (Issue 6), pp 2485-2495. ⟨10.1007/s10845-011-0515-7⟩. ⟨emse-00673896⟩
93 Consultations
0 Téléchargements

Altmetric

Partager

More