The optimal release dates in multi-level assembly systems with random lead times - Mines Saint-Étienne Accéder directement au contenu
Rapport (Rapport De Recherche) Année : 2006

The optimal release dates in multi-level assembly systems with random lead times

Résumé

A multilevel assembly system with one type of finished product and several types of components is considered in this paper. The lead times at each level are random discrete variables, and the finished product demand is fixed. The objective is to minimize the holding cost for components and backlogging cost for the finished product. We propose a novel mathematical model which gives the optimal release dates for the components. For a case of a linear supply chain (one type of component at each level) we show that this formulation is equivalent to the discrete Newsboy model. Numerical examples are reported.
Fichier non déposé

Dates et versions

emse-00679868 , version 1 (16-03-2012)

Identifiants

  • HAL Id : emse-00679868 , version 1

Citer

Faicel Hnaien, Alexandre Dolgui, Mohamed-Aly Louly. The optimal release dates in multi-level assembly systems with random lead times. [Research Report] Ecole des mines de Saint Etienne. 2006. ⟨emse-00679868⟩
84 Consultations
0 Téléchargements

Partager

Gmail Facebook X LinkedIn More