Balancing production lines composed by series of workstations with parallel operations blocks - Mines Saint-Étienne
Conference Papers Year : 2003

Balancing production lines composed by series of workstations with parallel operations blocks

Abstract

A balancing problem for paced production lines with workstations in series and blocks of parallel operations at the workstations is considered. The problem is to choose blocks from a given set and allocate them to workstations in such a way that all the operations are assigned, the precedence and compatibility constraints are satisfied, and the line cost is minimal. A method for solving the problem is based on its transformation to a constrained shortest path problem.
No file

Dates and versions

emse-00710124 , version 1 (20-06-2012)

Identifiers

Cite

Alexandre Dolgui, Nikolay Guschinsky, Genrikh Levin. Balancing production lines composed by series of workstations with parallel operations blocks. 2003 IEEE International Symposium on Assembly and Task Planning (ISATP'03), Jul 2003, Besançon, France. pp. 122 - 127, ⟨10.1109/ISATP.2003.1217198⟩. ⟨emse-00710124⟩
62 View
0 Download

Altmetric

Share

More