Smoothing Procedures for an Integrated Approach for Multi-Level Lot Sizing and Detailed Scheduling - Mines Saint-Étienne Accéder directement au contenu
Communication Dans Un Congrès Année : 2013

Smoothing Procedures for an Integrated Approach for Multi-Level Lot Sizing and Detailed Scheduling

Résumé

The integration of production planning and scheduling decisions represents an important challenge in production management. Typical Enterprise Resource Planning (ERP) systems, using Manufacturing Resource Planning (MRP-II) technique for capacity management, cannot guarantee feasible procurement and production plans at the operational level (short term planning horizon). In this paper we study the integrated multi-level lot-sizing and job-shop scheduling problem. We analyze various smoothing procedures that "repair" the relaxed capacity and Bill-Of-Materials (BOM) constraints in the Lagrangian heuristic of a recent approach.
Fichier principal
Vignette du fichier
IWSL2013_Gomez_et_al_v2.pdf (42.47 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

emse-00998470 , version 1 (02-06-2014)

Identifiants

  • HAL Id : emse-00998470 , version 1

Citer

Edwin David Gómez Urrutia, Riad Aggoune, Stéphane Dauzère-Pérès. Smoothing Procedures for an Integrated Approach for Multi-Level Lot Sizing and Detailed Scheduling. 4th International Workshop on Lot Sizing (IWLS 2013), Aug 2013, Brussels, Belgium. ⟨emse-00998470⟩
103 Consultations
211 Téléchargements

Partager

Gmail Facebook X LinkedIn More