Balancing production lines composed by series of workstations with parallel operations blocks

Abstract : A balancing problem for paced production lines with workstations in series and blocks of parallel operations at the workstations is considered. The problem is to choose blocks from a given set and allocate them to workstations in such a way that all the operations are assigned, the precedence and compatibility constraints are satisfied, and the line cost is minimal. A method for solving the problem is based on its transformation to a constrained shortest path problem.
Type de document :
Communication dans un congrès
2003 IEEE International Symposium on Assembly and Task Planning (ISATP'03), Jul 2003, Besançon, France. pp. 122 - 127, 2003, 〈10.1109/ISATP.2003.1217198〉
Liste complète des métadonnées

https://hal-emse.ccsd.cnrs.fr/emse-00710124
Contributeur : Florent Breuil <>
Soumis le : mercredi 20 juin 2012 - 10:15:07
Dernière modification le : dimanche 28 janvier 2018 - 15:22:05

Identifiants

Citation

Alexandre Dolgui, Nikolay Guschinsky, Genrikh Levin. Balancing production lines composed by series of workstations with parallel operations blocks. 2003 IEEE International Symposium on Assembly and Task Planning (ISATP'03), Jul 2003, Besançon, France. pp. 122 - 127, 2003, 〈10.1109/ISATP.2003.1217198〉. 〈emse-00710124〉

Partager

Métriques

Consultations de la notice

51